Call Us: 1300 093 795
Email Us: enquiry@elek.com.au

  • Login Cable Pro
Menu
  • Login Cable Pro
Electrotechnik
  • Software
    • Cable Pro Web (AU)
    • Cable Pro Web (UK)
    • Protection Coordination
    • SafeGrid Earthing
    • Cable High Voltage
    • Cable Pulling
    • Bare Conductor Ratings
    • Power Bundle
  • Resources
    • Article Categories
      • Low Voltage Design
      • Earthing Design
      • High Voltage Cable Design
      • Electrical Software
      • Arc Flash Studies
    • Tutorials
    • Free Calculators
      • Cable Sizing AS3008
      • Cable Sizing BS7671
      • Voltage Drop
      • Arc Flash
      • Earth Cable Sizing
      • Fault Loop Impedance
      • Earth Grid Resistance
      • Earth Grid Conductor Sizing
      • Earthing Rods Resistance
      • Lightning Protection Design
      • Relay Tripping Time
      • Equivalent Thermal Resistance
    • Courses
      • SafeGrid Earthing Software Course
    • Technical Publications
    • Training and Certification
  • Support
    • Support Overview
    • Help Portal
  • About
    • About Us
    • Contact Us
    • Services
    • Careers
    • Reseller & Partner Program
  • Login
    • Cable Pro Web Login
    • Training Courses Login
    • Customer Licence Portal
  • TRY FOR FREE
  • SCHEDULE A DEMO
  • TRY FOR FREE
  • SCHEDULE A DEMO
  • TRY FOR FREE
Menu
  • Software
    • Cable Pro Web (AU)
    • Cable Pro Web (UK)
    • Protection Coordination
    • SafeGrid Earthing
    • Cable High Voltage
    • Cable Pulling
    • Bare Conductor Ratings
    • Power Bundle
  • Resources
    • Article Categories
      • Low Voltage Design
      • Earthing Design
      • High Voltage Cable Design
      • Electrical Software
      • Arc Flash Studies
    • Tutorials
    • Free Calculators
      • Cable Sizing AS3008
      • Cable Sizing BS7671
      • Voltage Drop
      • Arc Flash
      • Earth Cable Sizing
      • Fault Loop Impedance
      • Earth Grid Resistance
      • Earth Grid Conductor Sizing
      • Earthing Rods Resistance
      • Lightning Protection Design
      • Relay Tripping Time
      • Equivalent Thermal Resistance
    • Courses
      • SafeGrid Earthing Software Course
    • Technical Publications
    • Training and Certification
  • Support
    • Support Overview
    • Help Portal
  • About
    • About Us
    • Contact Us
    • Services
    • Careers
    • Reseller & Partner Program
  • Login
    • Cable Pro Web Login
    • Training Courses Login
    • Customer Licence Portal
  • TRY FOR FREE
  • SCHEDULE A DEMO
  • TRY FOR FREE
  • SCHEDULE A DEMO
  • TRY FOR FREE

Home / Articles / Earthing Design

Lightning Strikes to Buildings with Earthing Systems

1639370701193 1099x585 - Lightning Strikes to Buildings with Earthing Systems

Lightning protection systems are designed to protect structures and prevent or minimize damage or injury that may be caused due to a lightning strike. These systems comprise air terminals, down conductors, equipotential bonding and buried earthing conductors and they should safely discharge the lightning currents into the general body of the earth.

A well-known Standard providing practical guidance on lightning protection system design is IEC62305 [2]. The lightning currents generated during a strike occur rapidly and are of extremely high magnitude.

This paper explains the effects of a direct lightning strike to an air terminal on top of a building structure which is connected to a buried earthing system.

Example building lightning protection and earthing system

In an example a building earthing system comprising an interconnected above ground down conductor network and buried earthing grid with driven rods was modelled.

The overall building height is 30 m. There are several 2.5 m tall air terminals designed to intercept the lightning current installed at the corners of the roof of the building.

The rebar installed inside the concrete slab of the building foundation is modelled as a mesh which is connected to the earthing system. A grading ring buried at 0.5 m surrounds the perimeter of the building with several 2-metre-long earth rods installed. The buried earthing system is installed in multilayer soil where the resistivity and permittivity are both frequency dependent.

A worst-case (first positive impulse 10/350 µs) lightning current was applied to a single air terminal as simulating a direct lightning strike.

Building lightning and earthing system model 1 - Lightning Strikes to Buildings with Earthing Systems

Simulation results – Direct lightning strike to the building

When lightning strikes an air terminal of a lightning protection system on top of a building the high-frequency currents flow downwards along the interconnected conductors.

The currents which flow along the conductors are called longitudinal currents and these exist in both the above- and below ground conductors. As current flows along the conductors in the network a voltage rise occurs which is maximum at the air terminal location and is attenuated along the conductors since like any electrical conductor, the conductors exhibit impedance to the flow of electrical current. Once the currents reach the buried earthing they are leaked into the ground, referred to as leakage currents, which depends on the series and mutual impedances between the conductors in the soil.

The high-frequency currents as they are dissipated create a potential rise in the surrounding soil resulting in surface voltages, as well as touch or step voltages hazards.

Leakage currents plot

The image shows that (as expected) none of the lightning current leaks from any of the above ground earthing. On the other hand, all the current is leaked into the soil by the below ground earthing. Higher levels of current are leaked by the buried conductors which are near to the air terminal and the perimeter conductors compared with the inner conductors in the mesh. Note that when low frequency faults occur the spread of leakage currents is higher and more evenly distributed amongst the buried earthing conductors.

1639370701039 - Lightning Strikes to Buildings with Earthing Systems

Longitudinal currents plot

The image shows maximum longitudinal currents exist nearest the faulted conductor (where the maximum current is injected) and that this current is then split between other conductors which are interconnected as it ultimately flows towards the ground.

longitude - Lightning Strikes to Buildings with Earthing Systems

Conductor voltages plot

The image shows the voltages of the conductors which are again highest near to the fault conductor and lowest on conductors farther away from the faulted conductor. In the case of high-frequency lightning currents not only is the maximum conductor voltage very high but the difference between the maximum and minimum conductor voltages is also great. However, this is very different compared with low-frequency faults where the highest and the lowest voltages are quite close especially for a meshed network of conductors.

1639370701022 - Lightning Strikes to Buildings with Earthing Systems

Surface, touch, and step voltage plots

The image shows the voltages that occur on the ground level because of the lightning current being dissipated into the soil.

1639370701167s - Lightning Strikes to Buildings with Earthing Systems

Conclusion

When lightning strikes occur on an air terminal installed on top of a building the distribution of currents and the resultant voltages on the lightning protection and the earthing system are complicated to predict.

It was important to include the above ground and buried conductors in the model.

The results presented by this study show in general what to expect and explains why. However, each individual case (installation) must be modelled specifically.

References:

[1] Safe Grid Earthing Software, Version 6.0.

[2] IEC 62305 Protection against lightning.

Related Articles:

elek article header ed fundamentals sm - Lightning Strikes to Buildings with Earthing Systems

Fundamentals of Earthing Design

This tutorial introduces key concepts used in the design of substation earthing/grounding systems. Important terminology is discussed including Grid Potential Rise, touch and step voltages and current distribution.

Read It Now
elek article header ed benchmark sm - Lightning Strikes to Buildings with Earthing Systems

Earthing Software Benchmark Study

The Annex H in IEEE Standard 80-2013 contains benchmark case results for comparing and evaluating software tools and methodologies used for the analysis of substation earthing.

Read It Now

SafeGrid Earthing Software

Easily design safe earthing systems in compliance with Standards.

Try For Free

Print this article:

Share on print
Print

SafeGrid Earthing Software

SafeGrid Earthing Software

Easily design safe earthing systems in compliance with Standards.

Try For Free

As used by:

For information or to speak with our helpful advisors

GET IN TOUCH

GET IN TOUCH

Electrotechnik-Footer

Electrical Power Systems Design & Analysis Software

FOLLOW US

social-fb
social-yt
social-li

SOFTWARE

  • Cable Pro Web
  • Protection Coordination
  • SafeGrid Earthing
  • Cable High Voltage
  • Cable Pulling
  • Line Rate
  • Power Bundle
Menu
  • Cable Pro Web
  • Protection Coordination
  • SafeGrid Earthing
  • Cable High Voltage
  • Cable Pulling
  • Line Rate
  • Power Bundle

RESOURCES & SUPPORT

  • Software Tutorials
  • Technical Publications
  • Training and Certification
  • Customer Licence Portal
Menu
  • Software Tutorials
  • Technical Publications
  • Training and Certification
  • Customer Licence Portal

CONTACT US

Email:
enquiry@elek.com.au

Need Help?
Lodge a Support Ticket

Phone:
1300 093 795
International:
+61 (0)2 8231 6673

FREE TECHNICAL NEWS

© 2022 All Rights Reserved    Privacy Policy Quality Policy Terms of Use

SafeGrid Earthing 14 day Free Trial

Fill out your details below to begin your trial. Once your information has been submitted you’ll be able to download the software.

  • Fill out your details below to begin your trial. Once your information has been submitted you'll be able to download the software.

  • This field is for validation purposes and should be left unchanged.

CLOSE

Schedule a Demo for Cable High Voltage

Look No Further. Get Started Today

  • This field is for validation purposes and should be left unchanged.
Schedule a Demo for SafeGrid Earthing

Look No Further. Get Started Today

  • This field is for validation purposes and should be left unchanged.
SafeGrid Earthing Free Trial
  • Fill out your details below to begin your trial. Once your information has been submitted you'll be able to download the software.

  • This field is for validation purposes and should be left unchanged.
Cable High Voltage Free Trial
  • Fill out your details below to begin your trial. Once your information has been submitted you'll be able to download the software.

  • This field is for validation purposes and should be left unchanged.
Cable High Voltage 14 day Free Trial

Fill out your details below to begin your trial. Once your information has been submitted you’ll be able to download the software.

  • Fill out your details below to begin your trial. Once your information has been submitted you'll be able to download the software.

  • This field is for validation purposes and should be left unchanged.

CLOSE

  • We strive for 100% customer satisfaction. If we fell short, please tell us more so we can address your concerns.

  • This field is for validation purposes and should be left unchanged.

If you do not wish to address your concerns here and prefer to post a review, click here.

Cable Pro (PC) Free Trial

Fill out your details below to begin your trial. Once your information has been submitted you’ll be able to download the software.

  • Fill out your details below to begin your trial. Once your information has been submitted you'll be able to download the software.

  • This field is for validation purposes and should be left unchanged.

CLOSE